Successful erection!

Like a phoenix from the ashes, our wind turbine has been resurrected after the false start on Dec 5th (see earlier post re Breaking News). Our lofty ambitions (including the height of the turbine) have been clipped somewhat (by 5 metres) but the power generated will be very useful on cloudy days when the solar panels are ineffective. Click on a pic to see it large with captions.

4 Replies to “Successful erection!”

Leave a Reply

Your email address will not be published. Required fields are marked *